Pages

Wednesday, April 10, 2013

CROSSTOWN APRIL UPDATE




In the last month since I last posted about the construction of the addition to the Crosstown Motors Dealership, the roof framing put up, the roof was then completed with asphalt shingles and the metal siding has started to be installed.
On the inside, the ground was warm enough to pour the concrete slab for the interior and some walls now have been insulated and drywall has been put up.  The mezzanine has also been framed up and rough-ins for the light fixtures have been pulled on both the interior and exterior.
I'm excited to see how this project will come together and how the end result will look.  It's great to have something being built that I designed and will have my name on. 
Updates to follow as the project finally comes together.

I will also soon be posting my other project I worked on earlier this year helping out with some design and rendering of a large two story family home down in Hanover NH area for a local architect. 

No comments:

Post a Comment